Techno
Economic Feasibility |
 |
Selection of Plant & Machinery |
 |
Preparation of Feasibility Report |
|
|
Project
Report |
 |
Layouts |
 |
Bar Charts |
 |
CPM Network |
 |
Profitability |
 |
Cash Flow |
|
|
Investigation
of Raw Material |
 |
Geological survey |
 |
Evaluation of Raw Materials |
 |
Preparation of Mining plant |
 |
Raw Mix Design |
|
|
Manufacturing and supply |
 |
Tailor made manufacturing of plant and machinery |
 |
Procurement and supply of ancillary machinery |
|
|
|
Instrumentation
and Process Control |
 |
Electrical Engineering and Installation |
 |
Procurement of MCC's and Control Panels |
|
Detailed
Engineering |
 |
Plant layout |
 |
GA Drawing |
 |
Equipment specification |
 |
Power distribution |
 |
Instrumentation and Process Control |
|
|
Erection
and commissioning |
 |
Management and supervision of the plant and
machinery |
 |
Alignment and trial runs |
 |
Commissioning |
|
|
|
|
|
|
|
Operation Management |
 |
Providing
guidance on Manpower planning |
 |
Training of
personnel for plant operation |
 |
Trouble
shooting |
 |
Performance
improvement |
 |
Production
Augmentation Optimization |
 |
Management
Information System |
 |
Technology
for Special Cements |
|
|
Environmental Engineering |
 |
Design/Selection
of Pollution Control Equipment |
 |
Installation
and Monitoring |
|
|
|
|
|
|
|
|
|
|
|